|
|
|
 |
 |
|
Multi-Stone Instructions
Countertops, Sinks, Bathtubs, Ceramic Tiles, Floors, Cabinets and Interior Walls.
- Clean
glass surfaces with the etch 4000 (only inside bathtubs and
sinks). Ceramic-tiles, floors and countertops clean with Premier
cleaner 5000. Lightly sand surface with 220 grit sandpaper before
primering.
- Tack
down surface with tack cloth before primer is applied.
- Primer
surface with permabond 2000 primer, with adhesion promoter added
to primer. Let primer dry for 15-20 minutes before applying
Multi-Stone color you are using, this in not required but helpful.
- MULTI-STONE
Spray 2 to 3 even coats over surface until look is s achieved.
When using multi-stone on surfaces that will take physical and
chemical abuse such as bathtubs, sinks, ceramic tile and countertops,
multi-stone MUST be clear coated.
- CLEAR
COAT - for best results wait 12 hours to clear coat. You can
clear coat with any of the industrial clear coats we carry,
they all will work fine. Spray 2 to 3 even coats of clear over
multi-stone. Multi-stone can be sanded with 600 grit sandpaper
prior to clear coating to achieve a smooth finish.
- Cabinets
and interior walls need not be primered with permabond 2000.
For interior walls you can use a latex primer if desired or
spray over excising painted surfaces with primering. Interior
walls and cabinets need not to be clear coated since they do
not take chemical and physical abuse other surfaces do.
- Spray
Equipment specifications, (minimum) HVLP gun and turbine with
80cfm at 4PSI. Any equipment, including air spray equipment
is usable as long as they meet the minimum requirements.
Any
technical questions about multi-stone please contact us.
|
Back to Multi-Stone
|
|
|
|
|
|